GILGYO ENGINEERING & CONSTRUCTION CO.,LTD.
Business Type Manufacturer
Main Products Isolation System using Plate Rahmen
{{product.PRODUCT_NAME_ENG}}
Company Overview
GILGYO ENGINEERING & CONSTRUCTION CO.,LTD.
- Gyeongsangbuk-do
- 306, Cheolgang-ro, Nam-gu, Pohang-si
- 37871
Company Introduction
Since its establishment in 2004, Gilgyo E&C has been developing pre-flex girder construction methods,
As a company that has led the integrated bridge bridge, new construction technology No. 698, 834 and new disaster prevention technology No. 88
has proven its excellent technology.
Recently, ICOM girders and internal fixtures, which have improved the efficiency and economic feasibility of the steel composite girder, have been installed.
“Second leap” by developing ITA girder, which is a PSC girder bridge, to improve the stress concentration phenomenon at the end by applying
is preparing.
Based on accumulated experience in design and construction for many years, we provide fast and accurate engineering services and
We promise to do our best for responsible construction.
As a company that has led the integrated bridge bridge, new construction technology No. 698, 834 and new disaster prevention technology No. 88
has proven its excellent technology.
Recently, ICOM girders and internal fixtures, which have improved the efficiency and economic feasibility of the steel composite girder, have been installed.
“Second leap” by developing ITA girder, which is a PSC girder bridge, to improve the stress concentration phenomenon at the end by applying
is preparing.
Based on accumulated experience in design and construction for many years, we provide fast and accurate engineering services and
We promise to do our best for responsible construction.
Start a Partnership with GILGYO ENGINEERING & CONSTRUCTION CO.,LTD. now!