Subdivision girders constructed from factories using high-strength concrete (70 MPa, 90 MPa) to assemble and install segment I after transportation to the site. Realize the longest span (70m) PSC girder method in Korea by joining three to seven segments with precisely manufactured junction blocks in both sides and introducing tension. Construction order